Related Engineering Work
- Fabrication & Installation of mild steel grating for risers opening;
- Fabrication & Installation of SS/FRP Drip Tray & Acrylic Box-up c/w removable Top Panel
- Hot Smoke Test in accordance to AS 4391 Standard;
- HDB Ceiling Duct Enclosure with Egg-Crate @ Bathroom, Access Panel, Suspended Clip-in Aluminium Perforated Ceiling @ lobby & General Gas/Water Pipe enclosure.
- Approved Scaffold Contractor – MOM Ref No. 084-010-00681;
Fabrication & Installation of jacketing for:- Gas Pipe,
- Hot Water pipe,
- Chill Water pipe,
- Chimney, etc
Mesh Grating
Jacketing
Roof Insulation @ Motor Room
Acrylic Box-up
Aluminium Ceiling @ Lift Lobby
Ceiling Duct @ WC
Gas Pipe Enclosure @ Corridor
Fire-Rated Box-up to Dry/Wet Riser Pipe & Gas Pipe
Approved installer for the following Fire Rated System:
- ‘Promatect’ H Board for Ductwork protection/GBS enclosure/Ceiling Membranes/Solid Partition, etc;
- Firetect Board for Industrial Wall Lining System;
- ‘Monolux’ Board for Ductwork Protection;
- ‘Knauf’ Fire Shield for Ceiling & Partition System
Ductwork Protection & GBS Enclosure
Ductwork Protection & GBS Enclosure
Fire Rated Partition