Related Engineering Work

  • Fabrication & Installation of mild steel grating for risers opening;
  • Fabrication & Installation of SS/FRP Drip Tray & Acrylic Box-up c/w removable Top Panel
  • Hot Smoke Test in accordance to AS 4391 Standard;
  • HDB Ceiling Duct Enclosure with Egg-Crate @ Bathroom, Access Panel, Suspended Clip-in Aluminium Perforated Ceiling @ lobby & General Gas/Water Pipe enclosure.

  • Approved Scaffold Contractor – MOM Ref No. 084-010-00681;
  • Fabrication & Installation of jacketing for:
    • Gas Pipe,
    • Hot Water pipe,
    • Chill Water pipe,
    • Chimney, etc

Mesh Grating


Jacketing

Site Photos for Jacketing2


Roof Insulation @ Motor Room

Site Photos for Roof Insulation @ Motor Room2

Site Photos for Roof Insulation @ Motor Room1


Acrylic Box-up


 

Aluminium Ceiling @ Lift Lobby

Site Photos for Aluminium Ceiling @ Lift Lobby1

Site Photos for Aluminium Ceiling @ Lift Lobby2


Ceiling Duct @ WC

Site Photos for Ceiling Duct @ WC1

Site Photos for Ceiling Duct @ WC2

Gas Pipe Enclosure @ Corridor

Site Photos for Gas Pipe Enclosure @ Corridor1

Site Photos for Gas Pipe Enclosure @ Corridor2

Fire-Rated Box-up to Dry/Wet Riser Pipe & Gas Pipe

Site Photos for Fire-Rated Box-up to Dry:Wet Riser Pipe & Gas Pipe1

Site Photos for Fire-Rated Box-up to Dry:Wet Riser Pipe & Gas Pipe


Approved Applicator for Fire Rated Systems

Approved installer for the following Fire Rated System:

  • ‘Promatect’ H Board for Ductwork protection/GBS enclosure/Ceiling Membranes/Solid Partition, etc;
  • Firetect Board for Industrial Wall Lining System;
  • ‘Monolux’ Board for Ductwork Protection;
  • ‘Knauf’ Fire Shield for Ceiling & Partition System

OLYMPUS DIGITAL CAMERA
Ductwork Protection & GBS Enclosure

 

Ductwork Protection & GBS Enclosure2
Ductwork Protection & GBS Enclosure


Fire Rated Partition

Fire Rated Partition


Gas Pipe Box-up

Gas Pipe Box-up

 

OLYMPUS DIGITAL CAMERA

Promastop Unicollar